DRAFT for Jacob's approval. Not live. Nothing here has been approved for publication.
Builder Connect Group Talk to a person(346) 273-1143
Buying land in Montgomery County to build on

Pick your area. We find the lot, represent you on the purchase, then match you to a builder.

Choose where you want to live in step 1 and see what the county records show for vacant lots there. Takes about two minutes, and a person from our team calls you back.

  • The county roll lists 60,328 vacant residential lots. We check flood zone, utilities and nearby permits before you walk one.
  • We represent you, the buyer, on the lot. We are not a builder.
  • Then we match you to a builder who fits your plan and your loan.

Next step: choose your area on the right.

Step 1 of 4

Where do you want to build?

Pick one area. You can add more when we call.

Based on Montgomery County vacant lot records. Other nearby areas on request.

Budget and timeline

So we search the right lots. A range is fine.

How are you planning to pay for the build?

Loan type decides how fast you can move. Not sure is a fine answer.

Where do we send your area lot search?

A person from Builder Connect calls you back. Business hours: inside 5 minutes. After hours: by 9am next morning.

Request received.

Nothing was sent. This is a draft preview with no form handler attached.

The builder pays Builder Connect's fee. Going direct to a builder does not lower your price. Compensation is disclosed in writing in your representation agreement.

What happens after you choose your area

Four steps, in this order. You sign a representation agreement before we introduce you to any builder.

We pull the county record

Lot size, flood zone, utilities and what is being built nearby, for lots in your area.

We search and show lots

You see lots that fit your budget and your plan. We represent you on the contract and the closing.

We match you to a builder

We are not tied to one builder, so we tell you which one suits your plan and your loan.

We stay at your table

Allowances, change order pricing and who pays for an overrun are where custom builds win or lose money. That is our job.

Why start with the area

The same budget buys a very different lot in Conroe than in Willis. Utilities, flood zone and lot size change the cost of the build more than the price of the land does.

What the build costs

Construction cost depends on the lot, the plan and the finishes, and site work varies a lot between lots. Working range per square foot: [RANGE TO BE SET BY JACOB]. A firm price comes from a builder on a real plan for a real lot.

One-time close or construction loan: which fits you

Ask a lender about both. We can introduce you to one. We give no rates here, a lender quotes those.

OptionHow it worksWhat to weigh
One-time closeOne closing covers the lot, the build and the permanent mortgage.One set of closing costs and one approval. The lot and the plan are usually tied together up front.
Construction loan with drawsThe lender pays out in stages as the build progresses, then you refinance into a mortgage.Two loans and two closings. Draw inspections run through the build.
CashYou pay for the lot and fund the build directly.Fastest to contract. Keep a reserve for site work and change orders.

How we get paid

The builder pays Builder Connect's fee out of the deal. Going direct to the builder does not lower your price, it only means nobody is on your side of the table. Compensation terms are written in your representation agreement before any builder introduction.

OPERATOR NOTE, NOT CUSTOMER COPY. Delete before publishing.
  • The area panel in step 1 shows SAMPLE lots. Subdivision names and acreage come from bar/data/sample-absentee-200.csv, a 200 row absentee owner sample skewed to larger lots. They are county records, not listings, and are not for sale unless confirmed.
  • Flood zone, utilities and nearby permits are not in that file. They appear as merge fields {{flood_zone}}, {{utilities}}, {{nearest_permits_1mi}} and must be filled from the live parcel feed or left blank. Do not hand fill them.
  • Areas with no sample row show merge fields only. Spring, Porter and others have 1 sample lot or fewer.
  • Build cost range is a placeholder for Jacob. Lender options are descriptions, with no rates.
  • Form posts nowhere. Hector wires it to the GHL Land search request form (name, email, phone, target area, budget, timeline, lender) with source tag lp-land-c.
  • Footer links for TREC and Consumer Protection Notice are placeholders.

Choose your area